AMNH Best Practices: Difference between revisions

From Frost Productions
Jump to navigation Jump to search
Gils (talk | contribs)
No edit summary
Gils (talk | contribs)
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 6: Line 6:
== HOL Main Screen ==
== HOL Main Screen ==
[[File:Screen in whale room2.png|thumb|11' x 20' Screen in whale room]]
[[File:Screen in whale room2.png|thumb|11' x 20' Screen in whale room]]
There are two primary configurations for screens in this room. Both involve a screen hung over the railing of the center of the far side of the room. Rigging details for both are shown here.  
There are two primary configurations for screens in this room. Both involve a screen hung over the railing of the center of the far side of the room. Rigging sections for both are shown here.
=== 9' x 16' Screen Rigging ===
[[File:9'x16' screen rigging section.png|200px|frameless|9'x16' screen rigging section]]


=== 11' x 20' Screen Rigging ===
<gallery mode="traditional" heights=400px widths=300px>
[[File:11x20 screen rigging section.png|200px|framless|11x20 screen rigging section]]
File:9'x16' screen rigging section.png | 9' x 16' Screen
File:11x20 screen rigging section.png | 11' x 20' Screen
</gallery>


== Truss Tower ==
== Truss Tower ==
<gallery mode="traditional" heights=250px widths=300px>
File:10' Truss Tower.png | 10' Truss Tower
</gallery>


== FOH ==
== FOH ==
Our HOL FOH setup involves an Ascender16 and two laptops. This image shows the typical configuration. Just beyond the decks and monitors would be the stairs. The gray table next to us is where lighting/SM would be set up.
<gallery mode="traditional" heights=300px widths=600px>
File: AMNH Front of House.png | AMNH Front of House
</gallery>

Latest revision as of 15:42, 23 July 2024

Parent article: Production Video

In the Hall of Ocean Life at AMNH, we have three primary features we repeatedly set up. The main screen, the 10' Truss tower, and the Ascender16 at FOH.

HOL Main Screen

11' x 20' Screen in whale room

There are two primary configurations for screens in this room. Both involve a screen hung over the railing of the center of the far side of the room. Rigging sections for both are shown here.

Truss Tower

FOH

Our HOL FOH setup involves an Ascender16 and two laptops. This image shows the typical configuration. Just beyond the decks and monitors would be the stairs. The gray table next to us is where lighting/SM would be set up.